Projects

FAA South Eastern Critical Radar Facility – Water Well
Project Consisted Of:
- Drilling a 6 inch well to 300 ft.
- Installing two new Pump Sheds.
- New electrical Control Panels.
- New water storage, treatment tanks, and associated piping.
- Closing of old well.
- Coordination with all Local, State, and Federal agencies for permitting and water quality standards.



