Projects

FAA South Eastern Critical Radar Facility – Water Well

Project Consisted Of:

  • Drilling a 6 inch well to 300 ft.
  • Installing two new Pump Sheds.
  • New electrical Control Panels.
  • New water storage, treatment tanks, and associated piping.
  • Closing of old well.
  • Coordination with all Local, State, and Federal agencies for permitting and water quality standards.
water Shed
Tanks
Well Drilling
Well Drilling Project